the Jersey Shore — Ocean County, NJ Free for homeowners — the crews pay us, never you

Brick, Brick

In-ground pool removal in Brick

Bayshore & river towns · Tier C

in-ground pool removal in Brick usually starts with a homeowner deciding it's time for something to go.

What usually prompts the call

  • An in-ground pool you have stopped using and no longer want to maintain
  • A cracked or leaking shell that would cost a fortune to resurface
  • A pool eating your yard, your insurance, and your weekends

Why this comes up in Brick

Drains well on the higher inland ground, but the extensive lagoon and riverfront neighborhoods sit low with a tidally influenced water table and broad flood zones, so waterfront excavations fill quickly. That's the context any crew working in Brick is dealing with.

A big mix of mid-century ranches and split-levels, waterfront and lagoon homes along the river and bay, and newer inland subdivisions, with in-ground pools, detached garages, decks, and sheds all common.

Brick specifically

Brick's extensive Metedeconk and bay lagoons mean many pool and structure removals here have to work around a bulkhead and a tidal water table that inland jobs never face.

Practicalities in Brick

Inland lots usually have driveways and room to work on site, while the lagoon streets off the river and bay are tighter and often stage from the road, sometimes with a bulkhead limiting the back of the lot.

What the ground does in Brick

Brick's demolition work splits along the waterline. Inland, the township's roomy subdivisions give crews driveway access and space for a machine and dumpster, and the sandier high ground drains, so pool and foundation excavations behave predictably. Along the Metedeconk and the bay, the lagoon lots sit low with a tidally influenced water table, a bulkhead often closing off the rear of the property, and broad flood-zone coverage — so a pool cavity or old footing fills fast and staging usually moves to the street. On waterfront lots, keeping equipment and spoil clear of the bulkhead is part of the plan.

What moves the price here

A dry inland Brick lot with driveway access prices differently than a tight lagoon lot where trucks stage from the road and the water table is up. Bulkheads and flood zones add planning on the waterfront side. Scope and access set the number, not the township name.

Any permit for this runs through Brick. State registration has to be current before one is issued.

The usual approach

There are two paths. A partial removal (the cheaper, faster option) breaks up the top of the shell, punches drainage holes in the bottom, and fills the cavity with the rubble and clean fill — it must be disclosed to future buyers. A full removal hauls the entire shell out and backfills with engineered fill, leaving buildable, unrestricted yard. Both need a municipal permit and both start with draining and disconnecting the pool.

This is the heaviest job on the list. A machine large enough to break a shell has to reach the pool, which on a fenced back yard can mean taking a section of fence out, and a great deal of material either leaves the site or gets processed into the cavity. Draining and disconnecting come first, and where the water goes is a question the town has an opinion about.

Before a crew can start in Brick

A permit for this address is issued by the Brick Township Building Department on Chambers Bridge Road. No New Jersey municipality issues a demolition permit to an unregistered contractor, which is why registration is the one thing confirmed before any referral goes out.

Brick separates principal structures from accessory ones in its fee schedule, and prices oil tanks on their own line — worth knowing on the older lots where a buried tank turns up during a garage or slab removal.

Demolition permit fees, Brick
Demolition of a principal structure$200
Demolition of an accessory structure$125
Oil tank removal or on-site abandonment$150

Source: Township of Brick Code, Chapter 145, Uniform Construction Codes (ecode360). Fee schedules change by ordinance — confirm the current figure with the office before you budget on it.

Demolition also carries a federal asbestos step. The owner or their agent has to document that the requirements of USEPA 40 CFR 61 subpart M are met, and that any friable asbestos — or material that would turn friable as the structure comes down — has been abated first. Towns generally want that in writing, along with confirmation that water will be applied during the work to keep particles down. 40 CFR 61 subpart M

$4,000 – $16,000typical range, not a quote. What your job actually costs can only be settled by a registered crew that walks the site and looks at it.

What it costs comes down to access, scope, and how much there is to haul away.

This work needs a municipal demolition permit. New Jersey requires a registered demolition contractor and utility disconnects before a job like this comes down. We only pass these to crews set up to pull the permit and handle it.

Wondering how serious it is?

Write down what you're seeing. We'll pass it to local registered crews and let you take it from there.

Get quotes in Brick →

Related

What tends to travel with this

Problems that tend to travel together.